Follow us on Facebook

Navy vessel after superstructure painting

115.00 tone oil tanker moored offshore

Ships aft area after painting and drafts marking

Technical Advisor & Project Manager

Painting of steel building

Hull painting

Blue Star Diagoras after external Low pressure washing & Painting

High pressure blasting 1000 bar

Final preparations before undocking

VLCC after very serious repairs

Welding works

Submarine navy

Bottom of vessel after grit blasting

Tankers near the station for oil

Navy

Fuel tanks

Oil & Gas supertanker after various repairs

Tank coating

Storage tank before maintenance

Oil Rig after various special Paintings

Hosing down 200 bar

Blue Star Diagoras after various repairs in Piraeus

Painting

High pressure blasting 1600 bar

Spot grit blasting

Completed hull of vessel in dry dock

Ultra high pressure water blasting 2.500 bar

Sand blasting of hull

Superfast Ferries IX after various repairs and reconditionin

Pipe lines and gas tanks

Sand blasting of container ship

Grit blasting of metal structures

Green renewable energy with generator turbines

Pipes transporting oil to storage tanks

Tanker vessel

Oil well with storage tanks after painting

High pressure water blasting

Crude oil tanker after various repairs on deck pipes

Abrasive blasting of metal structures

Dynamic Co. cherry pickers

Washing of building

Sandblaster on duty

Blue Star 1 after various repairs in NEORION Syros shipyard

Fuel tank among maintenance

Painting of cruise vessel after low pressure washing

Inspection of hull

Petrochemical industrial plant

Blue Star Ferry - Drydock

Ship in dry dock

Navy

Painting of Bridge construction

Blasting of paint for surface preparation

On the right side: Chemical tank after painting

Industrial metal fuel tanks

Fertilizer factory

Painting of Industrial warehouse

Large fuel storage tanks

Korean shipyard

Technical Support from Professional Project Management Engineer. DYNAMIC Co. cultivates a first-class project management team. Project management engineers are involved throughout the repair process. They not only know the production process and project management but also understand language and national differences in culture and ways of thinking, so they are good to solve a variety of professional issues, reduce conflict and misunderstanding, accelerate the repair process, ensure the repair quality and help customers to save repair costs.

Reliable Quality Assurance. For each ship, DYNAMIC Co. implements a mature internal selection mechanism for shipyards and professional construction teams, so as to ensure repair quality from the source and the most suitable shipyards and docks are chosen. In the repair process, project management engineers will implement process control for the repair quality. In addition, DYNAMIC Co. provides its customers reliable after-sales quality assurance.

Machineries