Follow us on Facebook

Ship in dry dock

Large fuel storage tanks

Oil & Gas supertanker after various repairs

Washing of building

Painting of Bridge construction

Painting of Industrial warehouse

Welding works

Oil well with storage tanks after painting

Spot grit blasting

Bottom of vessel after grit blasting

Oil Rig after various special Paintings

Blasting of paint for surface preparation

Industrial metal fuel tanks

Tanker vessel

115.00 tone oil tanker moored offshore

Fuel tanks

Blue Star Diagoras after external Low pressure washing & Painting

Blue Star 1 after various repairs in NEORION Syros shipyard

High pressure water blasting

Painting of cruise vessel after low pressure washing

Green renewable energy with generator turbines

Petrochemical industrial plant

Navy

Painting of steel building

Navy

Hull painting

Tank coating

Hosing down 200 bar

Inspection of hull

Ultra high pressure water blasting 2.500 bar

Sandblaster on duty

Completed hull of vessel in dry dock

Fuel tank among maintenance

Crude oil tanker after various repairs on deck pipes

Pipe lines and gas tanks

Storage tank before maintenance

Navy vessel after superstructure painting

High pressure blasting 1600 bar

Ships aft area after painting and drafts marking

Sand blasting of container ship

Blue Star Diagoras after various repairs in Piraeus

Abrasive blasting of metal structures

Grit blasting of metal structures

Blue Star Ferry - Drydock

Submarine navy

Tankers near the station for oil

Pipes transporting oil to storage tanks

Technical Advisor & Project Manager

Dynamic Co. cherry pickers

High pressure blasting 1000 bar

Korean shipyard

Painting

On the right side: Chemical tank after painting

Fertilizer factory

Sand blasting of hull

Final preparations before undocking

Superfast Ferries IX after various repairs and reconditionin

VLCC after very serious repairs

Technical Support from Professional Project Management Engineer. DYNAMIC Co. cultivates a first-class project management team. Project management engineers are involved throughout the repair process. They not only know the production process and project management but also understand language and national differences in culture and ways of thinking, so they are good to solve a variety of professional issues, reduce conflict and misunderstanding, accelerate the repair process, ensure the repair quality and help customers to save repair costs.

Reliable Quality Assurance. For each ship, DYNAMIC Co. implements a mature internal selection mechanism for shipyards and professional construction teams, so as to ensure repair quality from the source and the most suitable shipyards and docks are chosen. In the repair process, project management engineers will implement process control for the repair quality. In addition, DYNAMIC Co. provides its customers reliable after-sales quality assurance.

Machineries