Follow us on Facebook

VLCC after very serious repairs

Ships aft area after painting and drafts marking

Industrial metal fuel tanks

Sandblaster on duty

Fertilizer factory

Painting of Bridge construction

Sand blasting of container ship

Tankers near the station for oil

Grit blasting of metal structures

High pressure blasting 1600 bar

Submarine navy

Blue Star 1 after various repairs in NEORION Syros shipyard

Painting of steel building

Dynamic Co. cherry pickers

Crude oil tanker after various repairs on deck pipes

Blue Star Diagoras after external Low pressure washing & Painting

Fuel tanks

Painting

Korean shipyard

Navy

Large fuel storage tanks

Storage tank before maintenance

Bottom of vessel after grit blasting

Tank coating

115.00 tone oil tanker moored offshore

Fuel tank among maintenance

Hosing down 200 bar

Blue Star Diagoras after various repairs in Piraeus

Inspection of hull

Hull painting

Final preparations before undocking

Welding works

Green renewable energy with generator turbines

High pressure blasting 1000 bar

Oil & Gas supertanker after various repairs

Petrochemical industrial plant

Tanker vessel

Abrasive blasting of metal structures

Completed hull of vessel in dry dock

Technical Advisor & Project Manager

Spot grit blasting

Painting of Industrial warehouse

Oil Rig after various special Paintings

Sand blasting of hull

High pressure water blasting

Navy

Pipes transporting oil to storage tanks

Blasting of paint for surface preparation

Oil well with storage tanks after painting

Navy vessel after superstructure painting

On the right side: Chemical tank after painting

Superfast Ferries IX after various repairs and reconditionin

Pipe lines and gas tanks

Painting of cruise vessel after low pressure washing

Washing of building

Ultra high pressure water blasting 2.500 bar

Ship in dry dock

Blue Star Ferry - Drydock

Technical Support from Professional Project Management Engineer. DYNAMIC Co. cultivates a first-class project management team. Project management engineers are involved throughout the repair process. They not only know the production process and project management but also understand language and national differences in culture and ways of thinking, so they are good to solve a variety of professional issues, reduce conflict and misunderstanding, accelerate the repair process, ensure the repair quality and help customers to save repair costs.

Reliable Quality Assurance. For each ship, DYNAMIC Co. implements a mature internal selection mechanism for shipyards and professional construction teams, so as to ensure repair quality from the source and the most suitable shipyards and docks are chosen. In the repair process, project management engineers will implement process control for the repair quality. In addition, DYNAMIC Co. provides its customers reliable after-sales quality assurance.

Machineries