Follow us on Facebook

On the right side: Chemical tank after painting

Hull painting

Oil & Gas supertanker after various repairs

Industrial metal fuel tanks

Abrasive blasting of metal structures

High pressure blasting 1000 bar

Spot grit blasting

Pipe lines and gas tanks

Painting of Industrial warehouse

Dynamic Co. cherry pickers

High pressure water blasting

Painting of steel building

Ultra high pressure water blasting 2.500 bar

Welding works

Hosing down 200 bar

Korean shipyard

Inspection of hull

High pressure blasting 1600 bar

Crude oil tanker after various repairs on deck pipes

Tanker vessel

Blue Star Diagoras after various repairs in Piraeus

Final preparations before undocking

Fuel tank among maintenance

Grit blasting of metal structures

Ships aft area after painting and drafts marking

Painting of Bridge construction

Large fuel storage tanks

115.00 tone oil tanker moored offshore

Blue Star Ferry - Drydock

Technical Advisor & Project Manager

VLCC after very serious repairs

Pipes transporting oil to storage tanks

Ship in dry dock

Tankers near the station for oil

Sand blasting of hull

Bottom of vessel after grit blasting

Petrochemical industrial plant

Tank coating

Fuel tanks

Storage tank before maintenance

Fertilizer factory

Submarine navy

Navy

Completed hull of vessel in dry dock

Superfast Ferries IX after various repairs and reconditionin

Painting of cruise vessel after low pressure washing

Navy vessel after superstructure painting

Blue Star 1 after various repairs in NEORION Syros shipyard

Navy

Sand blasting of container ship

Sandblaster on duty

Oil Rig after various special Paintings

Blue Star Diagoras after external Low pressure washing & Painting

Green renewable energy with generator turbines

Oil well with storage tanks after painting

Painting

Blasting of paint for surface preparation

Machineries