Follow us on Facebook

Technical Advisor & Project Manager

On the right side: Chemical tank after painting

Bottom of vessel after grit blasting

Tankers near the station for oil

Fuel tanks

Sand blasting of container ship

Pipe lines and gas tanks

Hosing down 200 bar

Dynamic Co. cherry pickers

High pressure blasting 1600 bar

Industrial metal fuel tanks

Spot grit blasting

Painting of cruise vessel after low pressure washing

High pressure blasting 1000 bar

Crude oil tanker after various repairs on deck pipes

Fuel tank among maintenance

Sand blasting of hull

Inspection of hull

Hull painting

Welding works

Completed hull of vessel in dry dock

Blue Star Ferry - Drydock

Blue Star Diagoras after various repairs in Piraeus

Tanker vessel

VLCC after very serious repairs

Oil & Gas supertanker after various repairs

Painting

Green renewable energy with generator turbines

Grit blasting of metal structures

Submarine navy

Navy

Large fuel storage tanks

Pipes transporting oil to storage tanks

Fertilizer factory

Petrochemical industrial plant

Painting of Industrial warehouse

Oil well with storage tanks after painting

Ships aft area after painting and drafts marking

Painting of Bridge construction

115.00 tone oil tanker moored offshore

Painting of steel building

Final preparations before undocking

Superfast Ferries IX after various repairs and reconditionin

Blasting of paint for surface preparation

Tank coating

Ship in dry dock

Korean shipyard

Blue Star Diagoras after external Low pressure washing & Painting

Navy

High pressure water blasting

Blue Star 1 after various repairs in NEORION Syros shipyard

Sandblaster on duty

Storage tank before maintenance

Ultra high pressure water blasting 2.500 bar

Navy vessel after superstructure painting

Oil Rig after various special Paintings

Abrasive blasting of metal structures

Machineries