Follow us on Facebook

Technical Advisor & Project Manager

Fuel tank among maintenance

Blasting of paint for surface preparation

Industrial metal fuel tanks

Sand blasting of hull

High pressure water blasting

Grit blasting of metal structures

Tank coating

Pipes transporting oil to storage tanks

Blue Star 1 after various repairs in NEORION Syros shipyard

Ship in dry dock

Painting of steel building

Inspection of hull

On the right side: Chemical tank after painting

Final preparations before undocking

Painting of cruise vessel after low pressure washing

VLCC after very serious repairs

Spot grit blasting

Navy

High pressure blasting 1000 bar

Welding works

Navy

Painting of Bridge construction

Korean shipyard

Navy vessel after superstructure painting

Hull painting

Blue Star Diagoras after various repairs in Piraeus

Fuel tanks

Tanker vessel

Hosing down 200 bar

Completed hull of vessel in dry dock

Ultra high pressure water blasting 2.500 bar

Abrasive blasting of metal structures

High pressure blasting 1600 bar

Blue Star Diagoras after external Low pressure washing & Painting

Oil well with storage tanks after painting

Oil & Gas supertanker after various repairs

Sandblaster on duty

Oil Rig after various special Paintings

Green renewable energy with generator turbines

Storage tank before maintenance

Petrochemical industrial plant

Dynamic Co. cherry pickers

Painting of Industrial warehouse

Large fuel storage tanks

Pipe lines and gas tanks

Fertilizer factory

Crude oil tanker after various repairs on deck pipes

Tankers near the station for oil

Painting

Blue Star Ferry - Drydock

Superfast Ferries IX after various repairs and reconditionin

Sand blasting of container ship

115.00 tone oil tanker moored offshore

Ships aft area after painting and drafts marking

Submarine navy

Bottom of vessel after grit blasting

Our extensive experience has led us to believe that the accuracy of project inspections and estimates can have a dramatic effect on the client’s profitability.

“Under estimating” a project might seem to the client cost effective in the beginning, but sooner or later will lead to under staffing, compromising the quality assurance and setting too short a schedule. This could have a chain of unwanted effects such as, staff burnout, loss of credibility and deadlines being missed.

An accurate estimate and inspection is a critical part of any project. That is why, Dynamic Co.has developed a detailed estimation process by visiting the desirable destination worldwide in order to assess the nature of a project, inspect and record all the factors related to it and, finally, propose to you the best possible solution.

Machineries